Las Vegas Sun

March 29, 2024

Plan ahead for these road projects in the coming week in the Las Vegas Valley

Road closed

Las Vegas Sun photo

Here’s a look at some of the roadwork or road closings you might encounter in the coming week across the Las Vegas Valley:

SHORT-TERM ROAD PROJECTS

Nevada Department of Transportation

Eastbound Tropicana Avenue (State Route 593) from Sandhill Road to just past Rollingwood Drive: far right lane restrictions starting at 6 a.m. today for pavement and drainage repairs. Projected end date: 4 p.m. today.

ONGOING ROAD PROJECTS

Nevada Department of Transportation

F Street Connection Phase 3 — Interstate 15 between Washington Avenue and U.S. 95: I-15 on-ramp at D Street is closed; southbound lanes on I-15 have been moved to the northbound side and limited to two lanes in both directions. Projected end date: summer.

Eastbound 215 Beltway on-ramp from northbound U.S. 95: closed to traffic at 9 p.m. Sunday to prepare for widening of U.S. 95 from Ann Road to Durango Drive. End date: 5 a.m. Monday.

Westbound 215 Beltway on-ramp from U.S. 95: closed to traffic at 9 p.m. Sunday to prepare for widening of U.S. 95 from Ann Road to Durango Drive. End date: 5 a.m. Monday.

Buffalo Drive off-ramp from northbound U.S. 95: closed to traffic at 9 p.m. Sunday to prepare for widening of U.S. 95 from Ann Road to Durango Drive. End date: 5 a.m. Monday.

Clark County

Sahara Avenue Bridge over Desert Rose Golf Course: closed as part of the Las Vegas Wash and Flamingo Wash improvements. Projected end date: September.

Nellis Boulevard south of Sahara Avenue to pedestrian bridge of Flamingo Arroyo Trail: one lane will be closed due to construction on the Las Vegas Wash project. Projected end date: early September.

Lamb Boulevard between Owens Avenue and Las Vegas Boulevard: various lanes will be closed intermittently for a street and sidewalk improvement project. Projected end date: mid-September.

Desert Inn Road between McLeod Drive and Mojave Road: various lanes will be closed for a street and sidewalk improvement project. Projected end date: early September.

Las Vegas

Main Street between Carson Avenue and U.S. 95: east half of the road will be closed to traffic for reconstruction of drainage facilities, sidewalk and roadway. Two-way traffic will be on the west side of Main Street with one travel lane in each direction.Projected end date:2015.

Martin Luther King Boulevard at Mineral Avenue: street disruption for paving; expect delays. Projected end date: Sunday.

Rancho Drive between Sahara Avenue and U.S. 95: intermittent lane closures while fiber optic cables, traffic signal upgrades and digital message signs are installed to improve congestion. Work will be completed from 9 p.m. to 5 a.m. in busy sections of the road and from 7 a.m. to 3:30 p.m. in residential sections. Projected end date: fall 2014.

F Street between Bonanza Road and D Street: closed for bridge construction. Projected end date: Aug. 1.

Lake Mead Boulevard between Jones Boulevard and Decatur Boulevard: street disruption; expect delays. Projected end date: Monday.

Barbuda Road at Catalonia Drive: street disruption; expect delays. Projected end date: Monday.

Bonanza Road at Rancho Drive: street disruption; expect delays. Projected end date: Sunday.

Hills Center Drive between Village Center Circle and Lake Mead Boulevard: street disruption for landscaping; expect delays. Projected end date: indefinite.

Vegas Drive between Rancho Drive and Jones Boulevard: street disruption; expect delays. Projected end date: Aug. 30.

Fremont Street from 14th Street to 25th Street: street disruption; expect traffic delays. Projected end date: Aug. 10.

Bonneville Avenue between Martin Luther King Boulevard and Town Center Drive: street disruption; expect delays. Projected end date: Saturday.

Lone Mountain Road west of Rainbow Boulevard: street disruption; expect delays. Projected end date: Aug. 2.

Racel Street between Grazing Grass Street and El Capitan Way: street disruption; expect delays. Projected end date: Oct. 28.

Torrey Pines Drive at Lake Mead Boulevard and at Cheyenne Avenue: street disruption; expect delays. Projected end date: Saturday.

Henderson

Grand Teton Drive between Fort Apache and Oso Blanca roads: street disruption; expect delays. Projected end date: July 30.

North Las Vegas

Carey Avenue and Revere Street: intermittent street disruptions while a roundabout is removed and replaced with traffic lights. Projected end date: fall.

Losee Road and Lone Mountain Road: street disruptions starting next week while a pedestrian bridge is being built. Projected end date: fall.

OTHER DISRUPTIONS

Las Vegas

Eighth Street between Bridger Avenue and Fremont Street: closed from 5 p.m. to 9 p.m. Saturday for Las Vegas Carnival International Parade.

Fremont Street between 8th Street and 11th Street: closed from 5 p.m. to 9 p.m. Saturday for Las Vegas Carnival International Parade.

Ogden Street between 9th Street and 11th Street: closed from 5 p.m. to 9 p.m. Saturday for Las Vegas Carnival International Parade.

Join the Discussion:

Check this out for a full explanation of our conversion to the LiveFyre commenting system and instructions on how to sign up for an account.

Full comments policy